A VAN LEEUWEN SPECIALS
C-VENTUS JOINT VENTURE COMPANY

ABOUT VLCV

VLCV BV, a specialist company THAT PROVIDES turnkey projects requiring a combination of marine subsea activities and trenchless technologies.

VL Specials BV and C-Ventus Offshore Windfarm Services BV is pleased to present their Joint Venture, VLCV BV.

VL Specials, part of Van Leeuwen Trenchless Technology BV, is a land-based drilling specialist and construction firm which specializes in trenchless installation of pipelines and cables and provides subsurface construction solutions for the installation of infrastructural networks, conduits which carry electric cables and pipelines for carrying (sewage) water, gas, oil and other products.

C-Ventus Offshore Windfarm Services BV, part of DISA International, is a dedicated service provider with specialist knowledge in offshore windfarm installation, operations and maintenance (O&M) and decommissioning.  

VLCV BV, a specialist company which supplies turnkey projects requiring a combination of marine subsea activities and trenchless technologies.

Direct drill® project Borssele

VLCV BV is proud to announce its first project with the award of the Borssele Direct Drill® project on the 1st of October 2019.

Project description: The Borssele cable project consists of the design, manufacturing and installation of two Borssele Beta 220 kV 350 MW grid connections between the Borssele OWF offshore substation platform and the onshore substation at the town of Borssele. The site is situated in its entirety in Dutch territory and Dutch territorial waters. The contract for the performance of the scope of Works has been awarded to the consortium TenneT TSO B.V and NKT Cables GmbH & Co. KG and VBMS B.V. (“VBNK”).

Scope of Work: VLCV BV is contracted to install by Direct Drill technique two ducts including Bellmouth installation for TenneT and VBNK consortium. Two Direct Drill’s and duct installations of approximately 450m long will be made from a barge positioned on the mudflat towards the exit pit in the Western Scheldt seabed at ~50m of depth. This technique,is a single-step drill technique, consists of an onshore prefabricated pipeline that is directly connected with a drill head and installs in one pass after which the drill head is disconnected. VLCV BV has designed the drilling plan for this project considering the subsoil conditions, strength calculations and mud pressures which are implemented in the design. After drilling and installation of the duct, the drill head will be removed with a special disconnecting system. A DP2 vessel with a Work Class ROV recovers the drill head and installs the two Bellmouths with the use of special drill tools operated from the drill barge. The Bellmouth will be temporary closed with a special plug to seal the pipe ready for the cable pull-in works that will take place at a later stage.

Arvid de Groot, Project Manager at VLCV BV commented: “Today I can proudly announce that both ducts and Bellmouths have been successfully installed. Our teams have been working hard since October on the successful installation of both ducts. The successful completion of this EPC-project illustrates the capacities of VLCV BV on complex and challenging operations”.

Video compilation of the Borssele project

VLCV BV 

Ampèreweg 17
3442 AB  Woerden
The Netherlands

+31 (0) 348 44 14 99
tenderteam@vlcvbv.com
www.vlcvbv.com

CONTACT US

FOLLOW US